Customization: | Available |
---|---|
After-sales Service: | Instruction Install |
Warranty: | Long Time Use |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name: Adjustable Shoring Jack Schedule 40 |
The primary importance of shoring is to prevent accidents and injuries. Without proper shoring, trenches and excavations can collapse, leading to serious injuries or even death. It also ensures the stability of adjacent structures during construction, preventing damage or collapse that could result in costly repairs and legal liabilities.
This technique also provides support for construction workers to carry out their work safely and efficiently. Workers can move around freely and focus on their tasks without worrying about the risk of collapse or injury. This, in turn, increases productivity and reduces downtime and delays in the project.
In addition to safety and productivity benefits, it also provides cost savings. By preventing damage to adjacent structures and avoiding accidents and injuries, shoring reduces the risk of costly legal claims and insurance premiums.
The choice of shoring system depends on the type of structure or excavation, the soil conditions, and the intended use of the structure. Factors such as the duration of the shoring, the expected loads, and the presence of nearby structures must also be considered when selecting the appropriate construction shoring.
Timber shoring is a traditional type of shoring that involves using wooden planks and poles to create a temporary support system. It is suitable for shallow excavations and trenches and is cost-effective and easy to install.
Aluminum hydraulic shoring is a modern type of shoring that involves using hydraulic jacks to support the trench or excavation walls. It is suitable for deeper excavations and provides a more secure and stable support system.
Steel beam shoring involves using steel beams and plates to create a temporary support system. It is suitable for both shallow and deep excavations and provides a strong and durable support system.
Soldier beam and lagging shoring is a type of shoring that involves using vertical steel beams (soldier beams) with timber or steel planks (lagging) to create a support system. It is suitable for deep excavations and provides a secure and stable support system.
Product Name | Adjustable Shoring Jack Schedule 40 |
Material | Steel/Galvanized Steel |
Thickess | 2.5mm |
Height | 3.5m |
Kilograms | 9kgs. |
Surface Treatment | Painted/Hot Dip Galvanized |
Color | Metallic Gray |