Product Name: Galvanized Steel/Iron Tie Wire Gauge #16 |
PRODUCT DISCRIPTION
Galvanized Iron Wire
This is also known as Tie-Wire. We package them in rolls of 35 kgs by Birmingham Wire Gauge sizes. We make the softest wires in the industry.
THE PROCESS: BI Wires are heated through a bunker fuel-powered furnace, pickled through hydrochloric acid, and hot-dip galvanized in a Zinc bath to coat the surface.
GI Wire is cut and then used to tie steel bar structures (like rebar cages and stirrups) in place before pouring concrete. Its bendable nature makes it easy to make knots around steel bars.
Galvanized iron wire, or GI tie wire, is mostly used for fencing, weaving crafts, and bundling and fixing. It can withstand erosion from oxidation, dampness, and other elements because it is galvanized. It is simple to cut, bend, and weld due to its short length. Before concrete is poured, GI wire is cut and used to secure steel bar constructions (such as stirrups and rebar cages) in place. Making knots around steel bars is simple due to its pliable nature.
In construction, tie wire is a type of wire that is frequently used to hold, bind, and fasten various components together. Usually composed of low-carbon steel, it is coated to improve corrosion resistance and durability. Because the wire comes in several gauges.
Product Name |
Galvanized Steel/Iron Tie Wire Gauge #16 |
Material |
Steel/Galvanize Steel |
Gauge |
#16 |
Kilograms |
22kgs. |
Surface Treatment |
Painted/Hot Dip Galvanized |
Color |
Metallic Gray |
Features:
- Flexible
- Soft
- Galvanized Iron Tie Wire
Application:
GI tie wire, also known as Galvanized Iron Wire, is mainly used for
bundling and fixing, weaving crafts, and fences.
APPLICATION
FAQ
1.What is your advantage ?
Great products with competitive and professional service on export business
2. Can you give warranty of your products ?
Yes, we are sure our quality .If any concern may contact us directly
3. How could we believe your company ?
We consider honesty as the core of our company
4. How is the delivery time ?
Once receive done payment ,within one week will arrange the delivery .
5. What is your payment terms ?
T/T 30% advance, and balance payment once finish production .