Galvanized Iron Shoring Jack W/ Adjustable Straight Prop

Product Details
Customization: Available
After-sales Service: Instruction Install
Warranty: One Time Used
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (19)
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
  • Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
6.7feet-11.5feet
Certification
ISO, ROHS, CE
Material
Steel
Type
Base Formwork
Brand
OEM Production
Color
Metallic White
Thickness
2.5 Millimeter
Height
6.7feet - 11.5 Feet
Transport Package
Nude
Specification
6.7feet- 11.5feet
Trademark
7H PLUS/Fawalls/Guorui
Origin
Shandong China
HS Code
7308400000
Production Capacity
10000

Product Description

Product Description

Shoring is the process of building a short-term structure to support an unstable one. Laterally, these support the walls. 

Shoring can be utilized when a wall bulges out, when a wall cracks due to uneven foundation settling, when repairs need to be done, when a nearby structure needs to be torn down, or when openings need to be added to or widened in a wall.

Shoring is the technique of using shores (props) to temporarily support a building, vessel, structure, or trench when they are at risk of collapse or while undergoing repairs or modifications.

 

Shore-based shoring uses a wooden or metal support. Shoring could be horizontal, inclined, or vertical. Shoring is employed in the following circumstances:

  • when a wall exhibits evidence of bursting out because of poor construction.
  • Sometimes we must fix a wall crack brought on by uneven foundation settlement.
  • when a nearby structure needs to be taken down.
  • when openings in the wall need to be formed or widened.

Shoring is the temporary application of supports to a building or other structure. The Construction (Health, Safety, and Welfare) Regulations of 1996, in particular Regulations 9 and 10, must be followed when setting up and taking down a shoring system.

These have to do with working on structures where there is a potential for an unintentional collapse and hazard to everyone nearby or on the job site.

The Work at Height Regulations of 2005 also contains pertinent provisions pertaining to risk assessment. Shoring can last for a long period even if it is only a temporary solution while a permanent support structure is being constructed.

 

As a result, it is equally as significant as other construction-related factors. During assembly, disassembly, and any accompanying demolition, it must be subject to planned safety measures and professional supervision, regardless of how long it will be left in situ.

Types of Shoring

  1. Racking Shoring
  2. Flying Shoring
  3. Dead Shoring

Racking Shoring

This technique uses rakers, which are inclined members, to provide lateral supports for walls. The following elements make up a raking shore:

  1. Bracing
  2. Cleats
  3. Needles
  4. Rakers or inclined member
  5. Sole plate
  6. Wall plate

The use of shoring may be appropriate in the following circumstances:

  1. To provide support for weak or unsafe walls that are prone to sinking, bulging, or leaning.
  2. To prevent sound wall collapse brought on by the elimination of underlying support, as can occur when a basement is being built next to a sound wall.
  3. In the course of destruction to sustain a nearby building or structure.
  4. To provide support for an upper portion of a wall while the lower portion of the wall is being formed into a wide aperture.
  5. To sustain a floor or ceiling in order to remove a support wall and replace it with a beam.
  6. The typical material used for shoring members is structural softwood; it has a strength-to-weight ratio that compares favorably to structural steel and is more adaptable than steel.
  7. Shoring configurations can also be created by connecting sets of scaffold tubing.
sizes and specifications:
1.70 x 1.50m ( up to 3.10m full extension)
2.00 x 2.00m (up to 3.8m full extension)
2.00 x 3.00m (up to 4.80m full extension)
3.00 x 3.00m (up to 5.60m full extension)
 
Detailed Photos

 

Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
 
Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
Galvanized Iron Shoring Jack W/ Adjustable Straight Prop


 
Packaging & Shipping

 

Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
Galvanized Iron Shoring Jack W/ Adjustable Straight Prop
Galvanized Iron Shoring Jack W/ Adjustable Straight PropGalvanized Iron Shoring Jack W/ Adjustable Straight Prop
 
FAQ

 

1.What is your advantage ?

Great products with competitive and professional service on export business 

2. Can you give warranty of your products ?

Yes, we are sure our quality .If any concern may contact us directly 

3. How could we believe your company ? 

We consider honesty as the core of our company 

4. How is the delivery time ?

Once receive done payment ,within one week will arrange the delivery .

5. What is your payment terms ? 

T/T 30% advance, and balance payment once finish production .







MESSAGE US NOW !!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier