Shoring Jack for Construction Materials and Formworks Materials.

Product Details
Customization: Available
After-sales Service: Instruction Install
Warranty: Long Time Use
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (19)
  • Shoring Jack for Construction Materials and Formworks Materials.
  • Shoring Jack for Construction Materials and Formworks Materials.
  • Shoring Jack for Construction Materials and Formworks Materials.
  • Shoring Jack for Construction Materials and Formworks Materials.
  • Shoring Jack for Construction Materials and Formworks Materials.
  • Shoring Jack for Construction Materials and Formworks Materials.
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
shoring jack
Material
Metal
Type
Mobile
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Single Row Scaffolding
Erection Position
Internal Scaffolding
Move Method
Integral Lifting Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Building Scaffold
Color
Silver
Size
2.5 mm Thickness
Brand
OEM Production
Hieght
6.7 FT
Transport Package
Nude
Specification
6.7 ft (adj 11.5)
Trademark
7H plus / fuwalls / guorui
Origin
Shandong China
HS Code
7308400000
Production Capacity
1000

Product Description

shiring jack ( 2.5 mm thickness )
adjustable 3.5 meters
hieght 6.7 ft ( adj. 11.5
Coffral Shoring Jacks (a.k.a. Adjustable Telescopic Steel Props) are used to apply pressure on shoring surfaces, intended to hold the shape of the concrete or temporarily vertical support the precast units. They have high load-bearing capacity.Shoring is the process of temporarily supporting a building, vessel, structure, or trench with shores (props) when in danger of collapse or during repairs or alterations.Trench shoring equipment is required if the excavation or trench could collapse. Construction workers often need to gain access to trenches to carry out their work. If the trench is at risk of collapse it will pose a risk to construction operatives who need to work in the trench.Shoring is the provision of a support system for trench faces used to prevent movement of soil, underground utilities, roadways, and foundations. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical.All shoring should be installed from the top down and removed from the bottom up. Hydraulic shoring should be checked at least once per shift for leaking hoses and/or cylinders, broken connections, cracked nipples, bent bases, and any other damaged or defective parts.One of the most common shoring techniques used today is called H or I-Beam shoring. Another name for this process is soldier pile wall shoring. With this method, prefabricated steel H or I sections are driven or slid and vibrated into holes in the ground.
Shoring Jack for Construction Materials and Formworks Materials.
Shoring Jack for Construction Materials and Formworks Materials.
Shoring Jack for Construction Materials and Formworks Materials.
 
Shoring Jack for Construction Materials and Formworks Materials.
Shoring Jack for Construction Materials and Formworks Materials.
 
FAQ

 

1.What is your advantage ?

Great products with competitive and professional service on export business 

2. Can you give warranty of your products ?

Yes, we are sure our quality .If any concern may contact us directly 

3. How could we believe your company ? 

We consider honesty as the core of our company 

4. How is the delivery time ?

Once receive done payment ,within one week will arrange the delivery .

5. What is your payment terms ? 

T/T 30% advance, and balance payment once finish production .

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier