Customization: | Available |
---|---|
After-sales Service: | Instruction Install |
Warranty: | Long Time Use |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
A type of jack that is used to level scaffold components. It has a U-shaped slot that fits around a scaffold tube, and a screw mechanism that allows the jack to be raised or lowered.
scaffolding basejack uhead u head base jack.
Scaffolding heavy duty u head jack: Enable safe use on uneven ground and Base plate can provide extra stability.
ADTO Q235 Hot Dipped Galvanized Shoring Solid U Head is used for Screw Jack which is the necessary product in every scaffolding system to adjust the scaffold level whenever floor base not flat, special shaped, etc, which provide good solution for construction project, bridge, tunnel, civil building, etc.
U HEAD CASTING NUT | Turns the screw to raise or lower the scaffolding. |
U HEAD THREADED TUBE (SCREW) | A type of jack that is used to level scaffold components. It has a U-shaped slot that fits around a scaffold tube, and a screw mechanism that allows the jack to be raised or lowered. scaffolding basejack uhead u head base jack |
U HEAD PLATE | Allows for vertical adjustment to level the scaffolding. |
BASE JACK CASTING NUT | Turns the screw to raise or lower the scaffolding. |
BASE JACK BASE PLATE | Is a flat piece of metal that is used to distribute the weight of a scaffold structure. It typically has holes drilled into it so that it can be bolted to the ground or another surface. |
BASE JACK THREADED TUBE (SCREW) | Allows for vertical adjustment to level the scaffolding. |
1.What is your advantage ?
Great products with competitive and professional service on export business
2. Can you give warranty of your products ?
Yes, we are sure our quality .If any concern may contact us directly
3. How could we believe your company ?
We consider honesty as the core of our company
4. How is the delivery time ?
Once receive done payment ,within one week will arrange the delivery .
5. What is your payment terms ?
T/T 30% advance, and balance payment once finish production .