Galvanized Iron Adjustable Shoring Jack Schedule40

Product Details
Customization: Available
After-sales Service: Instruction Install
Warranty: Long Time Use
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (18)
  • Galvanized Iron Adjustable Shoring Jack Schedule40
  • Galvanized Iron Adjustable Shoring Jack Schedule40
  • Galvanized Iron Adjustable Shoring Jack Schedule40
  • Galvanized Iron Adjustable Shoring Jack Schedule40
  • Galvanized Iron Adjustable Shoring Jack Schedule40
  • Galvanized Iron Adjustable Shoring Jack Schedule40
Find Similar Products

Basic Info.

Model NO.
schedule 40
Material
Steel
Type
Beam Formwork
Thickness
Schedule 40
Full Adjust
3.5 Meters
Materials
Galvanized Steel
Weight
9 Kls
Transport Package
Nude
Specification
schedule 40
Trademark
7H PLUS/ FUWALLS/GUORUI
Origin
Shandong China
HS Code
7308400000
Production Capacity
5000

Product Description

Product Name: Galvanized Iron Adjustable Shoring Jack Schedule40
PRODUCT DISCRIPTION
Galvanized Iron Adjustable Shoring Jack Schedule40
Galvanized Iron Adjustable Shoring Jack Schedule40
Galvanized Iron Adjustable Shoring Jack Schedule40


Shoring is the construction of a temporary structure to support temporarily an unsafe structure. These support walls laterally. Shoring can be used when walls bulge out, when walls crack due to unequal settlement of foundation and repairs are to be carried out to the cracked wall, when an adjacent structure needs pulling down, when openings are to be newly made or enlarged in a wall.

Types of shoring

  1. Raking shoring
  2. Flying shoring
  3. Dead shoring

1. Raking Shoring

In this method, inclined members known as rakers are used to give lateral supports to walls (figure 1 to 3). A raking shore consists of the following components:
  1. Rakers or inclined member
  2. Wall plate
  3. Needles
  4. Cleats
  5. Bracing
  6. Sole plate

The following points are to be kept in view for the use of the raking shores:
  1. Rakers are to be inclined in the ground at 450. However the angle may be between 450 and 750.
  2. For tall buildings, the length of the raker can be reduced by introducing rider raker.
  3. Rakers should be properly braced at intervals.
  4. The size of the rakers is to be decided on the basis of anticipated thrust from the wall.
  5. The centre line of a raker and the wall should meet at floor level.
  6. Shoring may be spaced at 3 to 4.5m spacing to cover longer length of the bar.
  7. The sole plate should be properly embedded into the ground on an inclination and should be of proper section and size.
  8. Wedges should not be used on sole plates since they are likely to give way under vibrations that are likely to occur.

Why is Shoring Important?

The primary importance of shoring is to prevent accidents and injuries. Without proper shoring, trenches and excavations can collapse, leading to serious injuries or even death. It also ensures the stability of adjacent structures during construction, preventing damage or collapse that could result in costly repairs and legal liabilities.

This technique also provides support for construction workers to carry out their work safely and efficiently. Workers can move around freely and focus on their tasks without worrying about the risk of collapse or injury. This, in turn, increases productivity and reduces downtime and delays in the project.

In addition to safety and productivity benefits, it also provides cost savings. By preventing damage to adjacent structures and avoiding accidents and injuries, shoring reduces the risk of costly legal claims and insurance premiums.

Understanding the Different Types of Shoring

The choice of shoring system depends on the type of structure or excavation, the soil conditions, and the intended use of the structure. Factors such as the duration of the shoring, the expected loads, and the presence of nearby structures must also be considered when selecting the appropriate construction shoring.

Timber shoring is a traditional type of shoring that involves using wooden planks and poles to create a temporary support system. It is suitable for shallow excavations and trenches and is cost-effective and easy to install.
Aluminum hydraulic shoring is a modern type of shoring that involves using hydraulic jacks to support the trench or excavation walls. It is suitable for deeper excavations and provides a more secure and stable support system.
Steel beam shoring involves using steel beams and plates to create a temporary support system. It is suitable for both shallow and deep excavations and provides a strong and durable support system.
Soldier beam and lagging shoring is a type of shoring that involves using vertical steel beams (soldier beams) with timber or steel planks (lagging) to create a support system. It is suitable for deep excavations and provides a secure and stable support system.

Shoring Techniques Unveiled

Proper shoring planning and design are essential to ensure the safety and success of any construction project. A professional engineer or experienced shoring contractor should be consulted to evaluate the soil conditions, load requirements, and other factors to determine the most appropriate shoring system for the project.

Cantilever shoring is a common technique that involves supporting the trench or excavation walls using beams or sheets that are installed vertically into the soil. This creates a stable support system that can withstand lateral forces.
Raking shoring is a technique that involves installing inclined braces to support the trench or excavation walls. This technique is suitable for deeper excavations where vertical supports are less effective.
Cross-bracing is a technique that involves installing horizontal braces between vertical supports to create a stable and secure support system. This technique is commonly used in conjunction with cantilever or raking shoring.
Hydraulic shoring is a modern technique that involves using hydraulic jacks to support the trench or excavation walls. This technique is suitable for deeper excavations and provides a more secure and stable support system than traditional shoring techniques.

Real-World Applications of Shoring

Shoring has a wide range of real-world applications, each with its unique challenges and requirements.

Building Construction

Shoring is widely used in building construction to provide temporary support for building foundations and excavation trenches. The support system is necessary to prevent soil or structure collapse during excavation and ensure the stability of adjacent structures.

Infrastructure Development

Shoring is essential in infrastructure development projects, such as tunnels, bridges, and pipelines. The technique is used to support the excavation walls and maintain their stability during construction, preventing damage to existing structures and ensuring worker safety.

Mining

Shoring is also used in mining to provide support for underground mines and prevent the collapse of mine walls. The technique is used to provide temporary support during the excavation process and ensure the safety of workers.

Environmental remediation

Environmental restoration is another application of shoring. It involves the use of shoring systems to provide support during the excavation and removal of contaminated soil or other hazardous materials. Shoring systems in this context must be designed to prevent the spread of contamination and ensure the safety of workers and the public.

Other Fields of Applications

In addition to the above-stated applications, shoring is also used in various other projects, such as foundation repair, emergency response, and disaster recovery. In all these applications, it is crucial in preventing accidents and injuries, ensuring the stability of adjacent structures, and providing support for construction workers to carry out their work safely and efficiently.

Galvanized Iron Adjustable Shoring Jack Schedule40
Product Name Galvanized Iron Adjustable Shoring Jack Schedule40
Material Steel/Galvanized Steel
Thickness 2.5mm
Height 3.5m
Kilograms 9kgs.
Surface Treatment Painted/Hot Dip Galvanized
Color Metallic Gray
Galvanized Iron Adjustable Shoring Jack Schedule40
Features:

- Flexible
- Effective Way to Apply Pressure
- Shoring Jack Adjustable

Application:

shoring, form of prop or support, usually temporary, that is used during the repair or original construction of buildings and in excavations.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier