High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40

Product Details
Customization: Available
After-sales Service: You Can Send Us Message for Further Details
Warranty: N/a
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (18)
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
  • High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Applicable in Use
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
schedule #20 and schedule #40
Material
Iron
Type
Galvanized Iron
Structural Style
Frame Scaffolding
Framework
Frame Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
General Term
Support Erected
Capacity
Withstand a Lot of Weight
Usage
Temporary Structure Used to Support a Work Crew an
Accessibility
Widely Used on Site to Get Access to Heights and a
Specification
1.7m x 1.8m x 1.25m
Trademark
Guorui
Origin
Shandong, China
HS Code
7308400000

Product Description

Product Description

 

Scaffolding, also called scaffold or staging, Is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other human-made structures. Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to. Unsafe scaffolding has the potential to result in death or serious injury. Scaffolding is also used in adapted forms for formwork and shoring, grandstand seating, concert stages, access/viewing towers, exhibition stands, ski ramps, half pipes and art projects.The key elements of the scaffolding are the standard, ledger and transoms. The standards, also called uprights, are the vertical tubes that transfer the entire weight of the structure to the ground where they rest on a square base plate to spread the load. The base plate has a shank in its centre to hold the tube and is sometimes pinned to a sole board. Ledgers are horizontal tubes which connect between the standards. Transoms rest upon the ledgers at right angles. Main transoms are placed next to the standards, they hold the standards in place and provide support for boards; intermediate transoms are those placed between the main transoms to provide extra support for boards
 
Detailed Photos

 
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
 
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
 
Product Parameters

 

Size 1.7 meters height 1.8 meters length 1.25 meters width of h-frame
 
Schedule :  Schedule #20 Schedule #40
Weight 25 kgs 32 kgs
Applicable in Use

 

High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
 
Packaging & Shipping

 

High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40
High Quality H Frame Scaffolding Sets for Construction Schedule #20 & Schedule #40

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier