Product Description
Tube and fittings scaffolding is a traditional scaffolding, all the tubes are joined by clamps vertically and horizontally. Clamps are fixed by screwed T bolts. The diamater of the tubes is usually 48.3mm, so the diameter of the clamps are also of 48.3mm. It is widely used in commerical construction, residential construction, industrial construcion, oil and gas industry, bridge construction etc.
This double coupler is used to join two tubes at any angle and then is fixed firmly by tightening the bolts.
1) Raw material: Q235 steel bar
2) Processing method: drop forged
3) Diameter: 48.3mmx48.3mm
4) Finishing: hot dip galvanized
5) Processing capacity: 25 containers per month
6) Test Standard: EN74-1 BB
7) Package: plastic woven bags and steel pallet.
Scaffolding Couplers or scaffolding clamps is the main part of the tubular scaffolding system, it
plays a fasten and connection functions in system. Simple structure and big loading power, make
couplers easier and widely used on construction project. Scaffolding couplers include swivel and
fixed coupler, forged and pressed coupler, etc.
Different couplers have their own unique characteristics and be used in different construction
situations.
Product Parameters
Model NO. |
WY-K029 |
Type |
Fixed |
Structural Type |
Multiple Scaffolding |
Framework |
Combined Scaffolding |
Erection Position |
External Scaffolding |
Feature |
Heavy Duty |
Processing Method |
Drop Forged |
Scaffolding Part Type |
Building Scaffold |
Package
Plastic Woven Bags and Steel Pallet
Main Market
European Countries
Finishing
Hot DIP Galvanized
Processing Capacity
25 Containers Per Month
Transport Package
Plastic Woven Bags and Steel Pallet
Specification
48.3mmx48.3mm
Production Capacity
50000 PCS/Month
Packaging & Shipping
Packaging Details
Suitable for sea transportation
Port
Tianjin, Shanghai, Ningbo
Gross weight: (box)
18.5 kg
Detailed Photos
Our Advantages
1. Quality: Strictly control the quality through three levels. First level, quality test on the producing
line. Second level, quality test during warehousing. Third level, quality test before loading.
2. Timeliness: 24 hours online.Provide consulting and quotation services for customers all the time.
3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.
4. Integrity: If The customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.
5. Longevity: Establish good long-term relationship with customers.
FAQ
FAQ1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container or 40ft container , mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly.
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet.
3. Q: What's your delivery time?
A: 3-5 days after received the advance payment. For stel pipe, we can arrange shipment within 3-5 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.
4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.
5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.
7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.