Customization: | Available |
---|---|
After-sales Service: | You Can Send Us Message for Further Details |
Warranty: | N/a |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Scaffolding Pipe also known as GI Pipe or Steel Pipe is commonly used in Scaffolding system. They are used as temporary structure along with ladders and planks to support or elevate workers and also materials. For scaffolding construction, Wellmade's GI pipes are used to form staging access scaffold tower, suspended scaffolding, formwork shoring support system, etc. More than scaffolding pipes and clamps, scaffolding metal decks are used to form walking boards or work platforms in construction .Galvanized steel pipes are specifically designed for scaffolding applications due to their durability, strength, and resistance to corrosion.A scaffold (also called scaffolding or staging) is a temporary structure meant to support workers as they build. It is usually made of metal pipes.Scaffolding is designed to support workers who need to work at heights or in hard-to-reach places for construction, maintenance, or repair purposes. But it is built much stronger so as to carry multiple people, materials, or even equipment up to towering heights. Scaffolding is crucial to ensuring the safety of workers and repairmen, which is why you can't build any structure without erecting a scaffold first.While there have been records of accidents happening on scaffolds, these are few and usually not caused by the scaffolding itself. Additionally, the benefits of using scaffolding far outweigh the disadvantages, and there are ways to make sure no accidents happen on scaffolds to decrease the risk.
DN | Diameter | SCH40 (6m/5.8m) | SCH80(6m/5.8m) | SCH160(6m/5.8m) | |||
INCH | (mm) | Wall Thickness (mm) |
Unit Weight (kg/piece) |
Wall Thickness (mm) |
Unit Weight (kg/piece) |
Wall Thickness (mm) |
Unit Weight (kg/piece) |
1/4" | 13.7 | 2.24 | 3.79 | 3.02 | 4.80 | ||
3/8" | 17.1 | 2.31 | 5.04 | 3.20 | 6.60 | ||
1/2" | 21.3 | 2.77 | 7.62 | 3.73 | 9.72 | 4.78 | 11.7 |
3/4" | 26.7 | 2.87 | 10.14 | 3.91 | 13.2 | 5.56 | 17.4 |
1" | 33.4 | 3.38 | 15.00 | 4.55 | 19.44 | 6.35 | 25.44 |
1-1/4" | 42.2 | 3.56 | 20.34 | 4.85 | 26.82 | 6.35 | 33.66 |
1-1/2" | 48.3 | 3.68 | 24.30 | 5.08 | 32.46 | 7.14 | 43.5 |
2" | 60.3 | 3.91 | 32.64 | 5.54 | 44.88 | 8.74 | 66.66 |
2-1/2" | 73.0 | 5.16 | 51.78 | 7.01 | 68.46 | 9.53 | 89.52 |
3" | 88.9 | 5.49 | 67.74 | 7.62 | 91.62 | 11.13 | 128.1 |
3-1/2" | 101.6 | 5.74 | 81.42 | 8.08 | 111.78 | ||
4" | 114.3 | 6.02 | 96.42 | 8.56 | 133.92 | 13.49 | 201.24 |
5" | 141.3 | 6.55 | 130.62 | 9.53 | 185.82 | 15.88 | 294.66 |
6" | 168.3 | 7.11 | 169.56 | 10.97 | 255.36 | 18.26 | 405.36 |
8" | 219.1 | 8.18 | 255.3 | 12.70 | 387.84 | 23.01 | 667.62 |
10" | 273.0 | 9.27 | 361.86 | 15.09 | 576.06 | 28.58 | 1033.98 |
12" | 323.8 | 10.31 |
478.38 | 17.48 | 792.48 | 33.32 | 1432.56 |
Wall thickness (mm) | Tolerance (mm) (a) |
Seamless pipe (b) | |
WT ≤4.0 | +0.6mm -0.5mm |
4.0<WT<25mm | +0.150*WT -0.125*WT |
WT≥25.0 | +3.7mm -3.0mm |
welded pipe (c .d ) | |
WT≤5.0mm | ±0.5mm |
5.0<WT<15mm | ±0.5mm*WT |
≥15mm | ±1.5mm |
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Packing Details:
- Packing in bundles
- PVC Packing
- Pipe end cap
- Packing in wooden cases
Outer Diameter: 20-508mm
Wall Thickness: 1.2mm-12 mm
Length: 2000-16000mm,or as required.
Inventory: Customize the layer according to the zinc layer requirements.
Delivery Date: Custom-made 7-15 days;Riding to order's quantity.
1.What is your advantage ?
Great products with competitive and professional service on export business
2. Can you give warranty of your products ?
Yes, we are sure our quality .If any concern may contact us directly
3. How could we believe your company ?
We consider honesty as the core of our company
4. How is the delivery time ?
Once receive done payment ,within one week will arrange the delivery .
5. What is your payment terms ?
T/T 30% advance, and balance payment once finish production .