Customization: | Available |
---|---|
After-sales Service: | Instruction Install |
Warranty: | Long Time Use |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
GALVANIZED PIPE
In construction projects, the choice of materials holds immense influence over the durability, longevity, and overall quality of the end product. Galvanized iron (GI) pipes, in particular, have endured the test of time and sustained their popularity in construction circles. These pipes boast a unique range of advantages that positions them as a superb option for a wide array of applications.
This article seeks to explore the compelling reasons why you should choose GI pipes for construction projects. We will delve into their merits, applications, and the lasting value they bring to the table.
SIZE (diameter) | 1 1/2 |
Length (meter) | 6 |
Thickness (millimeter) | 1.5-1.8 (sch.20), 2.5-2.8 (sch.40) |
ITEM Galvanized Iron G. I. Pipe Steel |
STANDARD ASTM A213,A312,ASTM A269.ASTM A778, ASTM A789, DIN 17456. |
Standard DIN 17457.DIN 17459, JIS G3459, JIS G3463, GOS T9941. EN 10216,BS3605, GB13296.etc. |
Material 201,202,301.304.304L,304N,XM21,304LN,309S,310S.316.316Ti.316L316N.316LN.317.317L.321.329.etc. |
Surface Pickling, annealing, polishing, bright, sand blast, hair line, etc. |
Price Term Ex-work,FOB,CFR, ClF, or as required. |
MOQ 28 TONS Delivery Time Prompt delivery or according to order's quantity Application widely used in petroleum, chemical, medical, food,light industry, machinery,instrument and other industrial pipeline and mechanical structureparts, etc. |
1.What is your advantage ?
Great products with competitive and professional service on export business
2. Can you give warranty of your products ?
Yes, we are sure our quality .If any concern may contact us directly
3. How could we believe your company ?
We consider honesty as the core of our company
4. How is the delivery time ?
Once receive done payment ,within one week will arrange the delivery .
5. What is your payment terms ?
T/T 30% advance, and balance payment once finish production .