Customization: | Available |
---|---|
After-sales Service: | Immediately Installment Instructions. |
Warranty: | / |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Coffral Shoring Jacks
ITEM NO. | Closed Length(mm) | Open Length(mm) | Reference Weight(kg) | Work Bearing Capacity |
TEP-D25 | 1450 | 2500 | 15.1 | 20kN |
TEP-D30 | 1800 | 3000 | 17.1 | 20kN |
TEP-D35 | 2000 | 3500 | 18.9 | 20kN |
TEP-D40 | 2200 | 4000 | 22.2 | 20kN |
TEP-D50 | 2820 | 5000 | 35.2 | 20kN |
You should make sure the shore jack™ is centered under the horizontal member (beam, joists, etc.) that is required to support. Turn the adjusting screw until the 4x4 is firmly supporting the horizontal member. Lastly, use a level to vertically plumb 4x4 and verify that the 4x4 is centered under horizontal member.
The document provides instructions for installing heavy duty shoring for voided slab construction. It involves compacting the ground, conducting soil tests, placing sole plates and base jacks, then erecting vertical and horizontal frame members while ensuring verticality. Main and secondary bearers are installed, followed by erecting rebar and concrete placement in stages. Timber props for the top slab are removed after curing. All shoring components are dismantled after 28 days of curing.
Shoring Jack is used during pouring cement mix on slabs as support (pangtukod) to the formworks. Usually it is made of high quality B.I. material and can extend up to 5m or more. In our company, we have the following sizes and specifications: